Carrathool Bridge

A few progress shots of the Carrathool Bridge construction job, from May 2019.

Although the project was managed by another company, RRID was contracted to complete the construction survey before building could begin. This ‘set-out’ survey involved transferring the bridge design onto the land itself, establishing and marking out key locations.
Pictured is one of our Survey & Design specialists Chris, all geared up in his safety equipment while setting out kerb locations with his Trimble S6 Robotic Total Station.